The project of Knauf Plaster Board (Dongguan) Factory located in Dongguan Machong district, which included the construction of main building, homogenization silo, heavy oil depot, fire pool and office buildings. The project covered an area of 21,000 M2, adopted steel structure and concrete frame, , of which the construction duration lasted from April 1999 to May 2005.