Oriimec GuangzhouThe project of Oriimec Corporation of Guangzhou located in GETDD, which mainly included civil works, the installation of steel structure, M&E and other equipment. The
project covered an area of 2,522 M
2, adopted steel structure and concrete frame , of which the construction duration lasted from
March 2011 to August 2011.