The project of
Mccormick (GZ) Foodstuffs. Co., Ltd located in GETDD, which mainly included construction of main factory, office building, generator room, pump room sink and road of the factory . The
project covered an area of 4,300 M2, adopted
steel structure and concrete frame , of which the construction duration lasted
from February 1995 to February 1996.