The project of LG (GZ) Chem. Eng. Plastic Factory located
in GETDD, which mainly included the construction main factory, equipment foundation, road and drainage system. The project covered an area
of 7,600 M2, adopted steel structure, of which the construction duration lasted from September 2002 to April 2003.